Skip to main content

Our process

Remodeling without the guesswork.

Five clear steps, honest communication at each one, and no surprises about what happens next.
  1. A dated tub and surround before a True Mate project

    Step 1

    Tell Us About Your Project

    Call, send the estimate form, or pick finishes in our showroom. We'll ask a few questions and set up a time that suits you.

    • Call us, send the estimate form, or choose finishes in the online showroom.
    • We'll ask what you're hoping to change, check that you're in our area, and set a consultation time.
  2. Slab opened to check and relocate a shower drain

    Step 2

    In-Home Consultation

    We measure, check for anything that could affect the work, bring samples, and talk through how you use the space. No pressure, no obligation.

    • We measure the space and check for signs of moisture, soft floors, or plumbing issues.
    • You'll see wall samples, base options, doors, and accessories in your own light.
    • We talk through how you use the bathroom — and anyone who'll use it in future.
  3. New walls and floor being prepared in a compact bathroom

    Step 3

    Design & Written Estimate

    You receive a written estimate with a clear scope — materials, options, and what's included — so you can compare and decide with confidence.

    • Your written estimate lists materials, options, and the work included.
    • We explain how any hidden damage would be handled and priced.
    • There's no pressure to decide on the spot.
  4. New bathtub installed before the walls go up

    Step 4

    Professional Installation

    We protect your home, remove the old materials, check what's behind the walls, and install your new bathroom carefully. You'll know what's happening each day.

    • We protect floors and walkways and contain the work area.
    • Old materials are removed and the framing and plumbing are inspected.
    • If we find damage, we stop, show you, and get your written approval before repairing it.
    • Bases are set level and fully supported; walls and seals are installed to the manufacturer's requirements.
  5. Finished walk-in shower with teak seat and grab bars

    Step 5

    Final Walkthrough

    We walk through the finished work with you, explain care and maintenance, and make sure everything is right before we call it done.

    • We walk through every detail together and test everything.
    • You'll get care and cleaning guidance for your new surfaces.
    • We clean up thoroughly — your bathroom is ready to use.

Questions about the process

How long does a remodel take?
A straightforward tub or shower replacement is usually a matter of days rather than weeks, because wall-panel systems don't need tile setting and grout curing. Full bathroom remodels take longer since flooring, vanity, electrical, and paint are involved. Ordering lead times for doors, vanities, or special-order panels can add time before work starts. We give you a realistic schedule for your specific project in the written estimate, and we'll tell you right away if anything changes it.
How disruptive will the work be?
We protect the path from your door to the bathroom, keep the work area contained, and clean up at the end of each day. During a shower or tub replacement, that bathroom is out of service until the work is finished, so it helps to plan around a second bathroom if you have one. Noise is heaviest on demolition day. You'll always know who is coming, when, and what's happening next.
What happens if water damage is discovered?
It happens, especially in older bathrooms where a leak has been slowly working behind the walls. If we find rot, mold, or damaged framing after removal, we stop, show you what we found with photos, explain the repair, and give you the cost in writing. No extra work happens until you approve it. Fixing it properly now protects your new shower for the long run.
What happens at the free in-home consultation?
We look at your bathroom, take measurements, check for anything that could affect the project, and talk through how you use the space. You'll see wall patterns, base and door options, and safety features in person. Afterwards you receive a written estimate with a clear scope. There's no obligation and no high-pressure pitch.
Do I need a permit for a bathroom remodel?
It depends on the work and your local jurisdiction. Like-for-like replacements often don't need one, while moving plumbing, changing electrical circuits, or altering walls usually does. We'll tell you what applies to your project during the estimate.

Free in-home consultation

Ready for step one?

Whether you're planning a full remodel or exploring options for a new shower, we'd love to hear about your project.

Get a Free Estimate Call (910) 297-6186

No obligation · Written estimate · Locally owned

Call Now Free Estimate